Klein HS Plans
Prior to the March 2010 regular board meeting, Klein ISD released preliminary plans for the Klein High School rebuild. These plans took the form of a 5MB pdf presentation, which we have broken down here.
- Summer 2010: temporary buildings will be set up, and some students will be moved into the Annex building. (picture)
- Fall 2010: demolition of original classrooms, administration, and second gym. Students will be moved to remaining original buildings, Annex, and temporary buildings. (picture)
- Storm water detention area will be constructed. (picture)
- Over 18 months: two new buildings to be constructed, housing Athletics, CTE, Administration, Media Center and classrooms. (picture)
- Students will be moved into new buildings, allowing demolition of Annex, Career Center, Natatorium, Lifetime Sports and Pavilion. T-buildings removed. (picture)
- Over 18 months: remaining portion of new KHS will be built, housing Music/Fine Arts, CTE, Auditorium and Dining. New practice fields will be constructed on the site of the Annex. (picture)
- Students will occupy new KHS, allowing demolition of remaining original buildings. (picture)






